RUI Civil Engineering & Construction Pte. Ltd with Maeda Corporation of Singapore construction management (SCM) project, with construction performed by local contractors.
Project Overview
- Fill-Rock Dam (72m × 490m)
- Volume 3 million ㎥, Tunnel diameter 4.5m~7m, length 1,877m
- Storage Capacity 1,408 million ㎥
