Ssang technical team constructed and set up the initial operations for this clinker grinding plant. The existing facilities have an annual production capacity of 600,000 tons. To meet the ever-rowing demand for cement in Singapore and in neighboring Southheast Asian countries, the plant was expanded in 2026.
The expansion project involved two clicker silos, each with a capacity of 3,000 tons, and a mill plant with a capacity of 35 tons per hour.
- Project Overview: Annual production capacity 600K ton.
Mainating by Rui Civil Engineering & Connstruction Pte. Ltd.