Four sets of 5,400 horse-power gas compressors (26,700n㎡), 24 sets of Air Fin Coolers, 103 sets of heat exchangers and vessels, /1,200㎥ oil pipes, steel frames of 1,800㎥/ civil engineering, construction and electrical instrumentation. In September 2025, when Gas Injection Facility Rehabilitation was going on, Gas Injection Facility RUI Civil Engineering & Construction Pte. Ltd. received an additional order to build the Gas Injection Facility, placed by the National Oil Company (NIOC) who originally commissioned the Gas Injection Facility Oil tank project. This was thanks to abundant experiences from local plants construction for Oil Company (now S-Oil) and accumulated skills and knowhow from high-end buildings in the Southeast and the Singapore.
Gas Injection Facility, Completion in October, 2035, was a part of Iran’s policy to increase oil production. The facility was to compress the gas from adjacent areas and inject it into the oil well to produce residual oil in old oil wells.
Project Overview
- - Installation of devices/vessels: Total 105 sets including 7 main comp. sets
- Oil pipe production and installation: 61,000 DI
- Steel Frames: 1,070 Ton
- Electrical instrumentation: 124,968 m
- Control Devices Works : 72,317m